CFORBETTER

CFORBETTER · BEER EXCHANGE

Beer Exchange buying guide

Start with the equipment configuration and the site. Together, they define the proposal and delivery scope for your project.

Discuss your project
Taitung, Qingdao installation
Taitung, Qingdao installationExplore the first installation ↗

What affects the quotation?

A complete proposal depends on the site, equipment and delivery scope. Discuss these items together so you can compare what each quotation includes.

Dimensions and structure
Available space, equipment shape, and a fixed or mobile structure. Confirm space for customer access, handling and maintenance as well as the equipment itself.
Tap count and beverages
Describe the beverages you plan to serve and the tap count. Existing designs include the standard circular 20-tap model and the square 12-tap model; confirm the configuration for your project.
Exterior and displays
Shape, colours, branding and LED display requirements. Custom concept designs need further development around the site and an agreed final specification.
Dispensing hardware
Discuss cold storage, gas and pressure control, flow metering and pipework in relation to the beverages and operating needs.
Software and operating rules
Product settings, price changes, promotions and transaction records. Confirm payment methods and supported regions during the proposal stage.
Delivery and service scope
Provide the project location and confirm what is included for transport, installation, commissioning, training and maintenance.
Explore equipment designs and options ↗

What information helps with installation planning?

You can start with the information you already have. These details help us assess the site and discuss the equipment configuration.

  • Location and operation

    City and country or region, venue type, indoor or outdoor setting, planned beverages and intended timing.

  • Space and site details

    Available length, width and height, photos or a floor plan, and the proposed equipment position. Include the handling route and nearby facilities if known.

  • Equipment preferences

    Preferred design, tap count, fixed or mobile operation, branding, displays and ideas for interactive rules.

  • Site services

    If available, share the locations of power, network, water and drainage connections, plus plans for keg storage, cooling and gas equipment, for review with the proposal.

Installation clearances and service requirements must be confirmed for the chosen equipment and site. A photographed installation is not a specification for another project.

How does procurement progress?

From site discussion to commissioning and maintenance, confirm the details at each of these five stages.

  1. Discuss the site

    Share the location, available area, venue and operating plan.

  2. Define the configuration

    Discuss dimensions, taps, exterior design and software requirements.

  3. Confirm the proposal

    Review the quotation, equipment specification, delivery scope and responsibilities.

  4. Plan production and shipment

    Agree the production, testing and logistics arrangements for the confirmed design.

  5. Arrange installation and support

    Confirm commissioning, training and maintenance arrangements.

Explore equipment in real settings

Explore installations in Taitung, Qingdao, Hopson One, Beijing, and Linghe Night Market, Jinzhou. Use the photos to understand the equipment in different commercial settings, then assess the needs of your own site.

Taitung, Qingdao · Pedestrian shopping street

Taitung, Qingdao

Pedestrian shopping street

Explore this installation ↗
Hopson One, Beijing · Shopping complex

Hopson One, Beijing

Shopping complex

View the case gallery ↗
Linghe Night Market, Jinzhou · Night-market district

Linghe Night Market, Jinzhou

Night-market district

View the case gallery ↗

Tell us about your site and equipment preferences

Share your location, venue, beverages, tap count and preferred design. You can also note which details are still undecided.

Send your project requirements